Sherzod Zairov, M. Mekhmonov, Ravshanova Mukhabbat, Shukhrat Tadjiev, Gaibnazarov Bakhrom
Abstract
Abstract The productivity decline of technological wells during in situ leaching (ISL) is primarily associated with clogging of well filters and the near-filter zone, leading to a significant increase in hydraulic resistance and reduction in injectivity. Field observations indicate that injectivity loss in ISL wells can reach 30–70% after 2–3 years of operation. This paper presents an experimental study on restoring well productivity using explosive declogging with optimized multi-strand detonation cord charges. The method was tested on 6 technological wells under field conditions, combined with controlled polygon experiments. The study examined detonation cords with a linear explosive density of 12–20 g/m (PETN core) in configurations of 1 to 4 strands. A configuration of two parallel strands (≈ 15 g/m each) was identified as optimal, providing efficient disruption of clogging deposits while preserving the structural integrity of the filter.
Citation format
ZAIROV, Sherzod, et al. Enhancement of technological well productivity during in situ leaching using optimized multi-strand detonation cord charges (12–20 g/m): Experimental study. Journal of Engineering and Applied Science, 2026.