Beata Zawadzka, M. Marzec, T. Siwiec, Krzysztof Jóźwiakowski, A. Listosz
2026.3.1Inzynieria Ekologiczna
Abstract
The aim of the study was to determine the phosphorus removal efficiency of Rockfos ® material used to fill a full-scale meander-flow P-filter. The filter constitutes the final stage of a hybrid constructed wetland wastewater treat - ment plant located in Białka, Dębowa Kłoda commune in southeastern Poland. During the May 2022–July 2025 study, phosphorus removal efficiency and pH changes were analyzed based on wastewater analysis before and after the P-filter. Additionally, an extended wastewater analysis was conducted between August 2024 and July 2025, including analysis of total suspended solids (TSS), chemical oxygen demand (COD), biochemical oxygen demand (BOD 5 ), electrolytic conductivity, and total nitrogen (TN). The phosphorus removal efficiency of the meander-flow filter during the full study period was 44.43%. Statistical analysis showed a significant effect of P-filter on pH, turbidity, conductivity, and changes in phosphorus concentrations, total alkalinity, as well as BOD 5 . No significant effect was found on total nitrogen and COD.
Citation format
ZAWADZKA, Beata, et al. Pollutant removal efficiency in a meander flow filter applied in the outflow of a constructed wetland wastewater treatment plant – a case study. Inzynieria Ekologiczna, 2026, 27(3): 29–44.