BusinessEngineeringComputer Science

M. Bue, D. Cattaruzza, Maxime Ogier, F. Semet

2018.7.26AIRO Springer Series

DOI: 10.1007/978-3-030-25842-9_1

tlooto Summary

To deal with the large size instances of HappyChic in short computation times, a heuristic method based on the split and dynamic programming paradigms is designed and the results are very convincing: the total covered distance decreases by more than 20%.

Abstract

Abstract is not available.

Citation format

BUE, M., et al. A two-phase approach for an integrated order batching and picker routing problem. AIRO Springer Series, 2018.