EngineeringComputer ScienceMathematics

Zongyu Zuo, Lin Tie

2016.4.1INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE

DOI: 10.1080/00207721.2014.925608

tlooto Summary

It is shown that the finite settling time of the proposed general framework for robust consensus design is upper bounded for any initial condition, which makes it possible for network consensus problems to design and estimate the convergence time offline for a multi-agent team with a given undirected information flow.

Abstract

Abstract is not available.

Citation format

ZUO, Zongyu; TIE, Lin. Distributed robust finite-time nonlinear consensus protocols for multi-agent systems. INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2016, 47: 1366–1375.