Open AccessEnvironmental ScienceEngineeringMathematics
Y. Lv, G. Huang, Y. Li, Z. Yang, Y. Liu, G. Cheng
2010.12.1Journal of Environmental Informatics
tlooto Summary
The developed IFBP improves upon the existing bi-level programming by introducing interval mathematical programming (IMP) into its framework, which has advantages over the conventional programming methods with single decision maker in reflecting the interactions among multi-level objectives and strategies.
Abstract
Abstract is not available.
Citation format
LV, Y., et al. Planning regional water resources system using an interval fuzzy bi-level programming method. Journal of Environmental Informatics, 2010, 16: 43–56.