EngineeringGeologyEnvironmental Science

Khalid Elbaz, S. Shen, W. Cheng, A. Arulrajah

2018.7.13PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING

DOI: 10.1680/jgeen.17.00117

Résumé

The wear of excavation tools is considered to be one of the critical factors affecting the scheduling of shield tunnel construction. There is presently no effective countermeasure to prevent severe...

Format de citation

ELBAZ, Khalid, et al. Cutter-disc consumption during earth pressure balance tunnelling in mixed strata. PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2018.