A hierarchical structure for ranking risk in power-plant projects is proposed using a combined fuzzy analytic network process (fuzzy-ANP) and fuzzy-TOPSIS method and can consider dependence among the different criteria.
Abstract
Abstract is not available.
Citation format
ZEGORDI, S. H.; NIK, E. R.; NAZARI, A. Power plant project risk assessment using a fuzzy-anp and fuzzy-topsis method. International Journal of Engineering, Transactions B: Applications, 2012, 25: 107–120.